The Site Survey page can be used to record site-specific information. This is then used as a reference for designing the system, and added to the Installer Job Pack.
Default Fields
You can record the following info in the site survey:
- Building information - type, classing, height, storeys
 - Roof material, ridge spacing, condition, or if ground mount, the surface type
 - Upload multiple photos
 - Electricity supply info - meter number, phases, grid availability, pole/pillar numbers, main switch rating, meter model, overhead/underground connection
 - Site map (see below)
 - Cable lengths (can use site map to calculate long cable runs)
 - Battery install options - clearances from habitable rooms, cladding type, height of eaves
 - Customer's preferences
 - General notes
 
Creating Custom Fields
You can customise the site survey with additional information you want to gather during a site visit. To do this, go to Admin > My Business > Custom Fields
Options for field types:
Text: A single line of text
Select: Drop-down list, select 1 option.
Hidden: Shhh, it’s a secret
Email: Email address
Number: Integers or decimals
Check box: For yes/no information
Date/Time: Date/Time
Image: Upload an image
User select: Select from your list of users
Text Area: Text box for longer text responses
Radio: select one of a number of options.
Site Map
You can create a Site Map compliant with AS/NZS 5033:2021 from the Site Survey page (there’s a link back to it from the Installation Page).
- 
Drag and drop the icons you need onto the map
 - 
To adjust the lines between icons, Double click on the line to select it. Circles will appear on the line. Click and drag a circle to edit the line.
 - 
Click save, and click the camera to capture the image.
 - 
Click “Print Site Map” - watch for a pop-up tab in your browser.
 
The site map is also included in the installer job pack and the customer’s system manual.
Sitemap icons
| 
 Icon  | 
 Description  | 
|---|---|
| 
 
 
  | 
 Main street connection - Point of Interconnection (POI) where the project connects to the grid  | 
| 
 
 
  | 
 Connection point - Point of Common Coupling (PCC) where the ownership changes from customer to utility  | 
| 
 
 
  | 
 Main switch board - location of the main switch board  | 
| 
 
 
  | 
 Sub board - location of the sub-board/sub-mains  | 
| 
 
 
  | 
 Battery - location of the battery pack  | 
| 
 
 
  | 
 Inverter - location of the inverter (one icon for each inverter)  | 
| 
 
 
  | 
 Disconnection point - where there is no rooptop isolator which is simply the point where the string cable plug can be disconnected (direct cable run to inverter)  | 
| 
 
 
  | 
 Here - location where the sitemap will be placed (“You are here” pointer)  | 
| 
 
 
  | 
 Disconnect switch - rooftop disconnection device like DC isolator  | 